Monday, June 26, 2017

Deck Part 1- Framing

After getting approval from the HOA and then getting a building permit, it was finally time to get to building!  The first part of this process seemed to take forever and was not very exciting to be honest.  We Jeff had to dig three two foot deep holes.  I helped some, but digging is not my forte. The next day the inspector came out and gave us the go ahead to start building.  We did a little work with the band boards, flashing, and waterproofing but the real work set in on Monday. 

Monday and Tuesday were spent setting the posts, framing in the deck and putting down most of the decking.  Thankfully the weather was pleasant and we got some sun on our white bodies before our beach trip.  




Marley is not impressed wit the noise

Lots of measuring and checking to be sure we followed code


Added in a 6x6 to tie in the screened porch


Mom stopped by on her walk and took a few pictures of us both working















Almost done!


He's rolling now

I took a break while Jeff was finishing up the decking

Jeff's preferred method of getting up to the deck, while I used the kitchen window

Jack taking a peek from the window that I keep climbing in and out of to get to the deck